Bamboo wood floor quick installation method
As we all know, the wooden floor is made of natural wood material with clear and natural texture, and the bamboo floor is popular among consumers for its fresh and environmentally friendly characteristics. How do we install bamboo flooring? Let's take a look! First, it is best to unpack the bamboo floor in the field one week or two months before the paving, so that the bamboo floor is consistent with the humidity of the construction site before installation, which can effectively control the expansion coefficient after paving. Second, the floor should be installed in parallel with the entrance angle of the window. The bamboo floor of the corridor or the smaller area should be parallel with the longer wall. This can reduce the number of short splicing and save materials. Third, bamboo flooring is a natural material, its color and texture are different, can not be completely consistent, in addition to the floor production companies carefully color separation packaging, please make the appropriate color of the floor color, texture, length, etc. during construction, Make the floor more natural. Fourth, the installation of the ground must be smooth and dry. 5. The use period of bamboo and wood flooring is very long. It is recommended to install the keel so that the installed floor is not easy to loosen for a long time. Sixth, the paved keel must be dry. The specification of the keel is about 30mm × 30mm, and the length can be arbitrarily determined according to the size of the room. After the keel is positioned, the keel is nailed to the ground with cement nails. After the keel is fixed, a layer of moisture-proof mulch is placed on it. 7. In wet or particularly humid areas, such as East China and South China, do not pack too tightly between the floors. Please reserve a clearance of 0.5mm. In drier and cold areas, such as northeastern and northwestern China, natural joints between the floors are preferred. Eight, there must be more than 8mm reserved seam between the floor and the wall. 9. After drilling the hole in the male groove of the floor with an electric drill, nail the special floor nail to the keel at an angle of 45 degrees. Do not use the air nail. 10. After the floor is installed, the floor wax should be applied immediately. Note that the floor wax can only be applied to the gap and cannot be applied to the floor surface. (The picture in the text comes from the network) Rectangle Chafing Dish,Rectangle Chafing Dishes,Rectangle Chafing Dish With Spring Legs,Mobile Table Ware Shaoxing Biaoyi Hardware Products Co., Ltd. , https://www.byeob.com