Light steel keel ceiling construction technology is what ceiling construction considerations
The ceiling is one of the most important parts of our decoration. Because we know the importance of it when we are decorating, we pay attention to the quality of the decoration during construction. Because I don't know about the decoration, everyone doesn't know how to proceed. So everyone knows what needs to pay attention to the construction of light steel keel ceiling? Today, Xiaobian will take a look at the light steel keel ceiling construction technology and construction precautions! Light steel keel ceiling construction technology 1. Play the horizontal level of the ceiling, and play the horizontal control line according to the surrounding wall of each floor, requiring the line to be clear and accurate. 2. Dividing the keel's sub-line, the installation requires dividing the keel line on the divided main keel's ceiling elevation line. 3. Install the main keel boom. In order to ensure the stability of the whole skeleton, we need to fix the angle steel with expansion bolts. After the horizontal level of the high ceiling or the keel line, we must determine the elevation of the lower head of the boom. Do not touch the rod with a professional pipe. 4. Install the secondary keel. The secondary keel is divided into two types: the Ming keel and the dark keel. The secondary keel is divided into T-shaped paint keel and T-shaped aluminum alloy keel, and various strip gusset manufacturers are equipped with special keels. The secondary keel should be installed close to the main keel with a spacing of 300-600mm. The T-shaped galvanized iron piece joints are used to fix the secondary keel on the main keel. The two ends of the secondary keel should be placed on the horizontal flange of the L-shaped keel. The gusset plate has a special female corner line as a side keel. 5. The keel skeleton is fully calibrated, and the ceiling keel skeleton installed in place is fully inspected and corrected. After the main keel structure position and level are qualified, all the hanging parts and connecting pieces are tightened, and the clamps are firmly clamped to make the overall skeleton. Stable and reliable. 6. Gypsum decorative board installation, shelving installation: flat lap joint, wall mounted ceiling. The decorative plasterboard is lapped in the skeleton frame of the T-shaped keel assembly, and the ceiling decorative surface keel is exposed. When installing the plates, there should be a plate installation joint, and the gap on each side should be no more than 1mm. Light steel keel ceiling construction precautions 1. When installing the big keel, if the boom is uneven, the ceiling will be uneven, so check the tightness of the hanging point during construction, and check whether the elevation and flatness meet the specifications. 2. During construction, it is necessary to draw the line to find the right one. Pay attention to the specification of the plate construction and ensure that the straightness is straight, so as to avoid the situation that the gap is not straight. 3. During the construction, it is necessary to fix the front and back, so as to avoid the situation that the seaming strip and the edge strip are not strict and uneven. There are many details that need to be noticed when we carry out the construction of light steel keel ceilings, and it is critical to learn how to operate. The above is the introduction of Xiaobian today, and it is over here. If you want to know more information, please continue to pay attention to the decoration home. More related wonderful reading: Light steel keel ceiling construction technology, ceiling type introduction How to construct a light steel keel ceiling? Light steel keel ceiling construction technology Aluminum Household Items,Household Aluminum Kitchen Accessory,Aluminum Household Electric Drying Rack,Household Cleaning Accessory Guangdong Jihua Aluminium Co., LTD , https://www.gdaaluminiumprofile.com