PPR water pipe installation process

PPR pipe installation and installation have a set of standardized processes, everyone must be in accordance with the standard operation when the decoration of the house, water and electricity construction are hidden projects, hidden maintenance is very troublesome, it is best to ensure that there is no problem during construction. After the water pipes and fittings enter the site, they are accepted by the owners and workers. Water pipes try to choose brand materials such as Zhongcai, Pilsa, Baidie, etc., but beware of counterfeit products, there are anti-counterfeiting signs can be telephone inquiries, do not forget to check the product certificate. The hot and cold water pipes should be installed in left-right and right-cooled way with a spacing of not less than 30mm.

After the water pipes and fittings enter the site, they are accepted by the owners and workers. Water pipes try to choose brand materials such as Zhongcai, Pilsa, Baidie, etc., but beware of counterfeit products, there are anti-counterfeiting signs can be telephone inquiries, do not forget to check the product certificate.

The hot and cold water pipes should be installed in left-right and right-cooled way with a spacing of not less than 30mm. Use a pencil to set the position of the upper and lower metal tube clamps. The spacing between the two points should be no less than 800 mm, and then use a rotary hammer to drill at the anchor point.

Nail metal tube card with screws. After nailing the wooden wedge in the hole, then screw the metal pipe clamp on the wooden wedge. Make sure that the screw is firmly screwed into the wooden wedge to prevent loosening.

Hot melt according to the measured size. The temperature is controlled at 260°C. If the temperature is too high, the pipe wall will be hot and deformed. After the heat-melting, the water pipe and the pipe joint will be quickly joined in 5-7 seconds to ensure that the fusing ring is tightly bound.

Put the joined water pipes on the shelves and tighten the pipe clamps one by one with a screwdriver. Pay attention to the stress point at the corners and securely tighten the nozzles. The installation position of the valve should be accurate and flat (calculate the thickness of the tiles), which is easy to use and maintain.

All plugs are sealed and the pressure is measured with a pressure test pump 8-10mpa. After half an hour, look at the pressure gauge. Normally, the pressure drops down by 0.05mpa, which is qualified. If it fails, it is likely that there is a problem with the tubing, or the tubing is leaking.

A raw material tape is wrapped around the plug wire to prevent water leakage and the plug is tightened. Pipes embedded in walls and floors shall be treated with anti-corrosion treatment and protected with cement mortar.

Finally, the owner or supervisor is responsible for the acceptance of the entire water pipe laying project. The laying of water pipes should be horizontal and vertical. Hot and cold water pipes are up to standard, no leakage.

Summary: I have read so much information about the installation of PPR water pipes. We also have a preliminary understanding of this aspect. There may be other problems in the concrete construction. We must conduct specific analysis on different situations.

Hydropower renovation tile cement

OEM Audio

Professional OEM for Audio Electronics such like amplifier, DAC, equalizer. Our team had OEM experience for Norway high-end audio brand and can guarantee with high quality. Low volume is also one restriction when looking for good audio OEM. We are able to help you with low volume like 100 or 250 units per lot. With both AOI and manually visual inspection for the PCB to ensure each solder spot is well soldered and make sure the structure is balance which is important for audio device.

MPI have two division, electronics design & assembly house and metal stamping & CNC chop.We can provide OEM Sheet Metal Stamping Service.OEM CNC Machining Service.ODM Power Electronics Design and Assembly.ODM LED Driver.ODM Security AC/DC Power Supply.ODM Access Control Power Supply and so on.

In Electronics shop we provide our professional skills on power electronics design and manufacture. From A to Z, we can help you translate your idea into real products.

Our Metal shop provide professional stamping service which include creating mold, stamping and surface treatment. The implementation of CNC machine provide high precision machining parts and machining service to our customer.

Over 20 years experience on doing business with US and EU customers. We can understand what you need and what you concern.


Audio DAC,OEM Audio,Bluetooth DAC Amp,Audio Power Amplifier

Master Prosperous Industrial Co.Ltd. , https://www.mpigroup-taiwan.com