Ten items in the bathroom decoration
When the bathroom is renovated, there are many places to pay attention to. We know that the bathroom decoration is mainly not for the sake of decoration, but for functionality. But in the renovation of the bathroom, to do this, there are many problems. In the bathroom renovation, what are the precautions for the bathroom renovation? Bathroom renovation precautions: 1. Leave a little space for the ash of the shoes to leak to the bottom, and install the lights above the sink and gas stove. When you want to locate the floor drain of the bathroom, you must first think about it and measure the size. The floor drain is preferably located on one side of the brick. If it is in the middle of the brick, the floor drain will not be the lowest point no matter how the brick is tilted. 2. Bathrooms, air-conditioning outlets are not designed switches. Especially the bathroom electric water heater, with a two-stage switch with a plug is appropriate. If you want to turn off the electric heat, pull the plug is dangerous. 3. Regarding the treatment method of the corner of the brick, in the final analysis, it is to see the level of the worker. If the level of muddy workers is good, and the tools for grinding tiles are better, you should not hesitate to choose a 45 degree angle. From the effect point of view, as long as the grinding is good, the practice of grinding the angle of 45 degrees is the most beautiful! If the level of the workers is really not good, then you still choose to use the angle bar, because the bad grinding 45 The angle approach is not as good as the effect of using a positive angle strip. 4. It is also very important to test the water pressure after the water pipes are drained. When testing, everyone must be present, and the test time is at least 30 minutes, and the conditions are allowed, preferably one hour. 10 kg of pressure, and finally no test to pass. 5. When the steel door is made, it must be considered that the size of the steel door frame protrudes from the wall, and the installation personnel are informed that the final door frame and the wall of the finished tile are flat, so that it is both beautiful and sanitary. 6. The door cover of the woodworker and the tiling of the mason are also to be matched. When the door cover is used, it is necessary to consider whether the ground below (either side of the two sides of the door) is to be tiled or other cement mortar to level things. Because the door cover is nailed in front of the tile, it is always wrapped on the ground. When cement is used in the future, if the cement and the door cover are stained, it will cause the door cover wood to absorb water and mold. 7. Be sure to breathe under the mattress and on the bed. The bed board is generally best with fir boards. 8. Make paint as much as possible with paper tape. 9. Pay attention to the purchase of lamps: generally try to use glass, stainless steel, copper or wooden (shelf), generally do not buy what iron plating on the other plating, what paint and so on easily fade. 10. Wash basins as much as possible with ceramic basins. The "three defenses" problem of summer bathroom decoration: In each family, although the bathroom area is not large, but the function is not small, especially in the hot summer, for the bathroom, the most to be able to bring us Come cool. Who wouldn't want to create a comfortable and comfortable environment for our living environment in the summer? There may be some problems in the summer decoration, so the summer bathroom decoration should remember "three defenses." First, do a good job at the top The water in the bathroom is relatively large. At present, the general building is integrated with the bathroom and the bathroom, so the bathroom is often surrounded by water vapor, so the moisture protection of the roof is very important. To make the bathroom roof waterproof, it is best to apply a layer of water glass on the roof, and then use a PVC gusset with better waterproof performance. The gusset can be mounted on the keel and can also serve as a conduit. Second, protect the original waterproof layer When the new building is delivered for use, the bathroom is generally waterproofed, but most of the people's decoration will be paved with floor tiles, leveling the floor, and re-arranging the water and sewage pipelines. This will destroy the original waterproof layer of the bathroom, so the waterproof layer of the bathroom is re-established. Be sure to redo the waterproof when decorating. First use the cement mortar to level the ground, then do waterproof treatment, first clean the floor, and then repeatedly paint with polyurethane (water glass) waterproof coating 2 to 3 times. The joint between the wall and the ground and the ground joint between the water and the water are the most likely to leak. It is necessary to urge the workers to handle these corners and the waterproof coating must be applied. Require the decoration team to do the cement roots for the upper and lower pipes of the kitchen and bathroom. Brush the 10 to 20 cm polyurethane waterproof coating from the ground, and then re-do the polyurethane waterproof to enhance the waterproof. Third, check whether the waterproof is qualified After the waterproofing project is completed, seal the door and the water outlet, fill the bathroom floor with water to reach a certain liquid level, and make a mark. If there is no obvious drop in the liquid level within 24 hours, the roof of the house downstairs does not occur. Leakage, waterproofing is qualified. If the acceptance is unqualified, the waterproof project must be redone and re-inspected. Don't neglect this link. A lot of road repair teams don't do waterproof at all. They all finish the glass glue, so once the water leaks afterwards, it is too late to remedy. Therefore, the waterproof test must be done. After confirming that there is no leakage point, lay the floor tiles again. Non-Polished Brass Taps,Non Tarnish Brass,Non Tarnishing Brass,Non Abrasive Brass Polish AS-SUR INDUSTRIAL VALVE CO., LTD. , https://www.assur-valve.com