Bathroom tile laying skills to prevent detachment
Tiles are generally laid on the walls of the bathroom. If the tiles fall off, it will affect the overall appearance of the bathroom, so pay attention to the maintenance of the tiles. First, clean the base level before tiling If there are lime plaster, latex paint, wallpaper and other decorations on the wall, or there are dirt on the ground, it must be cleaned, otherwise the cement mortar will not bond well with the base layer; in addition, if the wall itself has cracks, it should be done properly. After the treatment, the bricks can be affixed to avoid cracking or falling off of the wall bricks in the future; and for the ground and wall surfaces with too much flatness or verticality, cement mortar should be used for leveling treatment. Compare the color difference of tiles before paving. Second, the wall tiles should be fully flooded Since the wall tiles have a high moisture content, this property must be taken into account when pasting. Before the tiling, the base layer should be fully watered and damp. Otherwise, the moisture in the mortar is quickly absorbed by the dried base layer and the tile, which will affect the bonding fastness. Otherwise, the wall tiles will absorb moisture from the cement, making the cement unable to act as a sticking agent. Third, paving the floor tiles should first flatten the ground The unpainted floor tiles are laid on the ground, and after being flattened, the cement slurry is spread on the floor tiles and laid on the ground, and the diagonal positions of the four bricks are flush. The order of laying is also very particular. The floor tiles should be affixed from the inside to the outside. If there is slope or floor drain on the ground, you should pay attention to finding the slope according to the drainage direction; the wall tiles should be laid from the bottom to the top. For the sake of beauty, the bottom brick should be attached. After the wall tiles are finished, press the floor tiles. In addition, one wall can not be attached to the top at a time, in case the tile has a large weight and causes collapse. Do not step on the floor tiles for a short time. Fourth, the tiles should be as much as possible In summer, because the material is more dry than usual, for materials such as floor tiles and ceramic tiles that require water treatment, it is necessary to extend the time of the water treatment to make the water close to saturation. In this way, it is not possible to absorb water from the cement due to the drying of the tile during bonding, so that the cement is not firmly bonded, and the phenomenon of emptying and falling off occurs, which brings unnecessary troubles to you. In order to cater to the trend of consumers, there are some new methods on the market, such as tile adhesives, colorful caulks, and seams. Tile adhesive (also called dry paste method), tiles do not need to be pre-immersed in water, the base surface does not need to be wet, as long as the foundation of the pavement is better, so that the homework situation is greatly improved. Square Shower Drain,Shower Grates Drain,Square Gold Shower Floor Drain,Square Gold Floor Drain Kaiping City Jinqiang Hardware Products Co.,Ltd , https://www.jqfloordrain.com