Integrated ceiling bathroom Yuba installed to give you a comfortable bathing environment
A comfortable family environment is the pursuit of all family members, of course, the bathroom is also essential. However, bath heaters are the preferred heating equipment for many families when bathing, but consumers always encounter many problems when installing and using them. Therefore, the following Xiaobian introduced the integrated ceiling bathroom Yuba installation. First, integrated ceiling bathroom Yuba installation steps 1, the corner line installation The installation of the collection bar should be smooth and firm, determine the installation height, and draw a horizontal line. In the case of horizontal tiles, the matching corner lines of the ceiling will be tightly fixed on the tiles, so that there is no obvious gap. 2, the installation of keel The distance between the suspender and the light steel keel, the suspender and the keel, and the size of the panel must be the same. At the top, inflate the eye and fix all the suspenders. The lower end of the suspender is connected with the hook, and then the main dragon skeleton is fixed in the middle of the hook. Adjust the height of the nut so that the main keel bottom plane is 3cm away from the upper plane of the edge trim. And tighten it. 3, the installation of auxiliary keel According to the actual installation length minus 5mm to take the necessary auxiliary keel, put on the triangle hanging pieces, according to the requirements of the drawings, all the auxiliary keel with a triangular hanging temporarily hang on the main keel. 4, the buckle board installation Cutting method: The template is fixed, with a utility knife and ruler portrayed more than three times, folding edge cut with a scissors into a 90-degree angle, folding by hand 2-3 times. Corresponding surface of the template cutting hole is stuck in the keel, the cutting surface is put on the edge strip, and the edge strip clamping position is pulled out to clamp the template. At this moment, the triangle hanging piece can be clamped with the steel pliers and the main keel. . When the middle part of the template is installed, the two corresponding surfaces of the template are respectively stuck in the keel to control the gap between the templates and maintain the straight line of the seams. Note: After completing the installation of each row of templates, the triangular hanger shall be clamped with the steel pliers and the main keel. 5, the installation of the host According to the design of the drawings, when the installation location of the heating type host is met, the host panel is used instead of the template to confirm the accurate host installation position; then the main cabinet is placed on top of the pay keel and fixed. Install (embed) electrical appliances, to make the panel and electrical interface smooth, seamless. 6, the top line and mouth panel The top of the line, to determine where the need to install lamps, which places need to install kitchen and toilet appliances, in advance the line layout. Button panel, this link is directly related to the overall effect of the ceiling. Not only do you have to be flat, but you have to do it straight. Second, the integrated ceiling bathroom Yuba installed accessories The accessories installed in the integrated ceiling Yuba include: full wire hangers, main keel (light steel keel), main keel hook (38 hanging parts), main keel joint, keel, keel joint (triangular joint), triangle hanger , Edge (punching oblique angle, bright lines). The correct installation sequence in the bathroom is to install the bathroom heater, exhaust fan, and then do the ceiling. Do not install the exhaust fan or bathroom heater directly on the aluminum gusset plate with screws, and use the expansion bolts to hang directly on the concrete on the top. Three, integrated ceiling bathroom Yuba preparatory work 1, equipped with tools Electric drill, adjustable speed hammer, cutting machine or polishing machine; square ruler, tape measure, level ruler; multimeter, utility knife, wire cutters. 2. Spare material Steel nails, ordinary nails, wood screws; insulating tapes, gloves; wood. 3, measurement Confirm accurate installation dimensions; specific dimensions and positions of houses and various structures; installation height of ceilings; determination of the installation position and orientation of the main engine; matching scheme of the template and confirmation of the host computer. Editor's summary: About the integrated ceiling bathroom Yuba installation is introduced here, I hope to be helpful to everyone. If you want to know more related information, you can pay attention to this website information. Yuba
Actmix®CaO-80, the hygroscopic agent for rubber compounds of all kinds to prevent porosity, particularly suitable for extruded rubber compounds, such as seals in car or building, which is vulcanized in hot air, fluidized bed, salt bath and microwave device.
Actmix®CaO-80GE F200 allows:
Dust free products with a complete filtration up to 45µm, environment improver, health guard of operators.
Lower water absorption and effective guarantee of stability and activity of CaO due to pre-dispersed masterbatch.
Rubber Hygroscopic Agent Rubber Biocide-algaecide Agent Rubber Hygroscopic Agent,Rubber Desiccants Agent,Rubber Super Dry Pack Hygroscopic,Rubber Strong Hygroscopic Ningbo Actmix Rubber Chemicals Co., Ltd. , http://www.actmixchemicals.com