Quantity calculation rules
1, the wall paint latex paint The amount of latex paint on the wall m2 = perimeter × height + top area - door and window area = (a + b) × 2 × d + a × b - door and window area Estimated number of bricks required = a/c × b/d (cannot be rounded up and consider 5% loss) Plate base layer, surface layer m2=a×b Ceiling decoration project volume m2 = surface + ceiling drop = a × b + c × 4 × d Roof plate estimate = a/c × b/d (cannot be rounded up and consider 5% loss) One kitchen and one bathroom, about 20 packages of cement, about 60 bags of yellow sand One kitchen and two bathrooms, 30 packets of cement, and 90 packets of yellow sand. Electric tube: Two houses 70 three rooms 130 wires: two rooms 700 ~ 900 meters, three rooms 1200 ~ 1500 meters Decoration budget knowledge tree paint paint paint wallpaper wallpaper latex paint floor tile
[Aluminum Alloy Housing Solar Lights]
Different from other solar lamps with plastic housing. Lightweight but strong. Sandblasted and anodized metal housing,anti-oxidation and corrosion resistance. It can be used for many years even in extreme weather or harsh outdoor environments and maintain its performance. The lampshade is made of engineering plastic PC material, which is heat-resistant, anti-ultraviolet, and anti-yellowing.
[High Efficient Solar Panel]
PET solar panel with a larger lighting area, it can absorb sunlight faster, so that it can be recharged faster. Charging for 8 hours, can be illuminated for more than 12 hours.
[High-END LED For Bright Outdoor Lighting]
LED beads is not the more the better, the key is the lifespan and brightness.
[Microwave Radar Induction & Dawn To Dusk Lighting]
Radar motion sensor is a detector that combines microwave receiving and transmitting equipment. The working principle is based on the Doppler effect. The microwave wavelength is very short, between 1mm and 1000mm, so it is easily reflected by objects.The sensing angle is greater than 180°, and the farthest sensing distance can reach 32 feet.Ultra-long runtime on always on mode,up to 12H for dusk to dawn lighting.
[Four Working Modes & Waterproof]
Four working modes meet all your requirements for lighting.Mode:Faint light to strong light ;No light to strong light;Always lighting;Emergency lighting.You can set the mode arbitrarily.Waterproof,suitable for any outdoor scene: Garage, aisle, porch, patio, garden, deck, camping, yard, farm, fence, wall, etc.
Outdoor Solar Wall Lights,Aluminum Solar Wall Lights,Solar Motion Lights Outdoor,ALUMINUM ALLOY HOUSING Solar Light Shenzhen You&My Electronic Technology Co., Ltd , https://www.szyoumyled.com
2, floor tiles as shown in the figure:
Number of bricks required (block) Balance = axb/ ((c + patch) X (d + patch)) × (1 + loss rate)
3, floor tiles as shown:
Estimated floor number = a/c × b/d (Not rounded up, consider 5% loss)
The required number of floors (blocks) is calculated as axb/(cXd) × (1+ loss rate)
4. Coating, paint dosage
5 brick wall tile as shown:
6. The paint area of ​​the paint brush shall be the area of ​​the brush part or the multiplication coefficient of the product.
1. Calculation method for wall skirt paint surface: length × height (with no skirting height)
2, baseboard paint surface calculation method: area calculation 3, cupboard, Taiwan paint surface calculation method: unfold area calculation 4, window plate paint surface calculation method: length × width as shown:
Single-layer door paint quantity m2 = area of ​​brush part × coefficient = a × b × 1
Baseboard paint quantity m2=(a+b)×2×e
7. Suspended ceiling as shown: (full height high and low top)
8, the roof as shown:
The amount of roof plate (block) is calculated as axb/(cxd) × (1+ loss rate)
9. Wallpaper, carpet material wallpaper, carpet material = use area × (1 + loss rate)
Note: The loss rate is generally between 10% and 20%, and the oblique wear rate of wallpaper is generally 25%.
10. Decoration total cost
1 Basic items: material costs + labor costs
2 Management fee: 1×5%
3 Taxes: (1+2) x 3.41%
4 Total Decoration Cost: 1+2+3
Supplement 1.:
About the amount of cement yellow sand. (Is regular budgets not counted, generally based on experience)
Wire and wire tube usage (also estimated)