Round Tubular Galvanized Steel Post Pole with Flange
FAG deep groove ball bearings,FAG spherical roller bearings,FAG Cylindrical Roller Bearings,FAG tapered roller bearings,FAG thrust roller bearings Shanghai Yi Kai Cheng bearing Co., LTD , https://www.ykchbearing.com
Founded in 2005, Jiangsu Bosheng Steel Poles Co.,Ltd located in Heqiao Town Industrial Zone, Yixing District, Wuxi City, Jiangsu Province, China.
Â
Bosheng is the specialized manufacturer of various steel poles and steel components including street lighting poles, electric power poles, traffic signal poles, flag poles, wind power poles and microwave communication towers, etc.
Â
Through Shanghai Port, which is one of the largest ports in China, we export poles to South America, Middle East, Africa, Australia, Philippines and other countries.
Product Show
Material
Applied to the material of general-purpose steel GB/T1591-2008, Q235, Q345, Q420, Q460 used in China.
China-GB
America-ASTM
Equivalent
Q235
Grade D
SS400,S235JO
Q345
Grade50[345]
S355JR
Q420
Grade60[415]
S420NL
Q460
Grade65[450]
S460NL
Our factory owns advances production lines and machines including bending calibration machine, hydraulic plate shears machine, shears machine, slitting machine, 208T hydraulic straightener, etc. All insure us to produce steel poles with best quality.
After the fabrication process as cutting plate, bending, forming, automatic welding, drilling holes, we get poles checked before galvanized, hot dip galvanized and powder coating and finally we get poles checked according to client's requirements.
Inspection
To ensure the quality, we have professional technicists to inspect the poles during the manufacturing and before delivery.
We have Lab Test, Workload Test, Steel thickness Test, Galvanization thickness Test, etc.
Delivery
We normally use 40HQ containers and our Port limit weight for a 40HQ is 26 tons
FAQ:
1. Port of Loading: Shanghai, China
2. Price term: EXW,FOB,CFR AND CIF.
3. Payment Term: 30%TT in deposit, 70%TT before shipment. Â Or LC.
4. Delivery: Based on your order quantity. Normally 15 days after receiving your deposit.