The focus of the hydropower process during the rainy season
Links: Look at pictures: details that need special attention for hydropower reform Huangmei Season Hydroelectricity Process Focus In the hydropower process, attention should be paid to the normalized operation of the circuit transformation. When the rainy days are renovated, the bare wires cannot be directly buried in the wall or the floor. It must be protected by PVC wires and pipes, especially when it rains on the balcony. In a wet place, be sure to wrap copper wires that are exposed outside the wires during embedding and prevent the wires from short-circuiting after being exposed to moisture. For the wires around wood products such as damp wood keels, block boards, etc., care should be taken that if it is not careful, it may cause fire. During the Huangmei Season hydropower construction, special attention should be paid to safety. Due to the high humidity in the air, live operation is very dangerous. As much as possible, remind construction workers to wear insulated gloves. Special attention must be paid when operating. Links: Graphic: What is the normative hydropower construction Hydropower renovation Exposed Shower Valve Exposed Shower Valve,Hand Shower Faucet,Hand Held Shower Heads,Hand Shower,Shower Faucet SHENZHEN KING OF SUN INDUSTRY CO.,LTD , https://www.handybasinfaucet.com
Exposed Shower Valve is the simplest shower faucet. Single lever independently operate, automatic mixed cartridge design. Durable ceramic cartridge can guarantee 500,000 cycles no leaking. The thickness of electro plating reaches to 8 to 12 microns. The surface remains bright and durable even after passed 48 hours spray salt testing.