Renovation of the six key points of the owners must be on the scene
The quality of home decoration is the most concerned issue for the owner when decorating, but how can we guarantee the quality and make the decoration cost worthwhile? The best way is of course to supervise the whole process. However, for most owners, the supervision time is limited and the decoration knowledge is unfamiliar. In this case, how to deal with it? The insiders suggest that during the renovation, the temporary supervision of the site at six appropriate times will greatly improve the quality of the decoration. Workers pay attention to communication when entering the scene Before the renovation, the owner, designer and construction team leader should communicate. In short, it is generally necessary to ensure the content of the three aspects, to lay the foundation for the later work: First, to confirm the design of the house, such as clear where the need for the line pipe, where to do what, do know in mind; second To determine the direction of water and electricity, and carefully look at the layout of water and electricity; the third is to determine the changes in the structure of the house, which need to communicate well with the construction team and designers. When the worker enters the scene on the first day, the designer will explain to the construction team leader how to construct. There are many details. The owner should be present. If there is any doubt, he can immediately raise it and solve the problem on the spot to avoid troubles and disputes in the future. Check the material carefully when entering the scene When the decoration materials come into play, the industry mainly checks whether the materials on the budget sheet and the materials sent to the site match, otherwise the materials may be troublesome if they are sent incorrectly. Therefore, when the materials come into play, the owner must be on site, carefully check the brand, quality, quantity, etc. of the materials. For the new wall tiles, not only the brand model but also the quality of the wall tiles should be checked. Is there a color difference? Water pipes and wires, etc., should also pay attention to verify the true and false. Pay attention to safety when doing ceiling When the ceiling structure is used, the owner should also go to the scene. First, check whether the fulcrum of the ceiling around the wall is firm. Secondly, determine whether the wood keel has been fireproofed and treated. Because there are wires, electrical appliances, transformers, etc. hidden in the ceiling, in case of leakage and fire, it will cause burning, so it must be checked clearly to avoid potential safety hazards. The structure of the ceiling is not simple, but because it is hung on the top of the head every day, we must ensure that its quality is perfect, so as to ensure safety. The suspension of the ceiling and the top surface should be hammered with a US-made nail to make the ceiling safe and firm. Personal inspection when water pipe pressure test After the water pipe is connected, it is necessary to do a water pressure test because it is not clear whether there is a leak in the welded interface. This test is necessary. The water pipe has passed the water pressure test to ensure that it will not leak in the future. At present, the PPR water pipes commonly used in public homes are 1.5 times higher than the daily water pressure. After one hour of pressure, no water leakage is found, and the water pressure is basically not qualified. Because the water pipe is an important part of the concealed project, the water pipe is immediately sealed after the acceptance is passed. If it is missed, there will be no chance of remediation in the future. Therefore, the owner must be personally inspected on site. Pay attention to three points when wiring the electric tube The owner should go to the site before the sealing of the hydropower line, mainly to ensure three aspects: 1) the capacity of the wire in one wire pipe can not be greater than 40% of the line pipe; 2) the strong and weak electricity can not be worn in the same line pipe, such as The network cable and the wires cannot be worn in the same tube. If such a situation occurs, the strong and weak electricity will interfere with each other, which will not only affect the normal operation of the network cable, but also trigger a safety accident. 3) It is necessary to see that there is no recess at the turn of the casing. The place, because there are holes in the place where the holes are difficult to pass. The arrangement of the electric tube and the arrangement of the water pipes should be as horizontal and vertical as possible, and the strong and weak electric lines must be separated by 30cm. Beware of leaks when installing natural gas pipelines When the natural gas pipeline is installed, the owner must go to the site. First, check whether the natural gas pipeline is leaking after installation. Secondly, pay attention to the fact that the pipeline position cannot be too close to the electric wire, otherwise the accidental electric spark may cause an explosion. Moreover, the shower is the intersection of water, electricity and natural gas. During the use, the temperature will rise and fall suddenly, so it must not be taken lightly, and it must be personally inspected on site. Ultrasonic Cold Or Heat Flowmeter Ultrasonic Cold Or Heat Flowmeter,Split Ultrasonic Heat Flowmeter,Ultrasonic Gas Heat Flowmeter,Pipeline Split Heat Flowmeter Jiangsu Baichuang Instrument Group Co.,Ltd , https://www.subcip.com