Saving money does not play "flower live"
Entrance decoration children's room decoration interior decoration decoration design home window space decoration find decoration company good decoration home
PP Butterfly Valve is made by FRPP or PPH body with seat EPDM or Viton, lug type or wafer connection as per standard DIN PN10, ANSI CL150, JIS10K, CNS, operated by manual handle, gear drive, electric and pneumatic operate. Size from 2" to 40", working pressure by PN2 to PN10, temperature up to 95 degree. PP BUTTERFLY VALVE is widely used for water treatment, mining factory, steel plant, chemical factory, ect.
Ningbo RMI Plastic Co.,Ltd offer PP butterfly valve with specification:
Size range:DN50~DN600 (2 inch ~ 24 inch) PP Butterfly Valve,PPH Butterfly Valve,Butterfly Valve PP,GRPP Butterfly Valve Ningbo RMI Plastic Co.,Ltd , https://www.rmiplast.com
So how do the decoration control costs, so that decoration companies and workers are playing less expensive "flower"? As long as you can skillfully work hard and plan carefully, it is possible to save money and be unique. You will get twice the result with half the effort.
â– Controlling time is about 50 days for controlling the normal cost of the budget. However, many owners accidentally dragged the time to two or three months or even longer. It takes time and not only to toss their time and money. , And the construction of the workers will also be slowed down a lot, an unreasonable increase in a lot of costs, if it is based on time charges, then it is even more uneconomical.
Therefore, for the owner, the preparatory work should be done well before the renovation, that is to say, design, materials, inquiry and budget should all be done in advance, and then start work. This is the most scientific. The more complete the preparatory work, the faster and more efficient the decoration and efficiency of the future, and the lower the actual cost. It is also worth noting that for owners who choose their main materials, they must contact the workers in advance and communicate with them well. They can let the workers inform about the materials you need to prepare about ten days in advance to facilitate the owners’ purchase and guarantee the use of materials. At that time, the materials could be entered on time so as not to delay the construction period.
â– No need for expenses to squeeze out For the first-time owners, seeing the quotation will always feel dazzling. In fact, some informal small companies use the unprofessional skills of the owners to increase expenses. The items that the owners pay attention to, such as brick laying and wall surface treatment, are not different from those offered by large companies, but they will increase in other costs, such as waste cleaning and dismantling fees, etc., to improve the cost. Therefore, it is best for the owner to figure out the reason for the expense of each item. It is also better to calculate the cost of the demolition wall and so on, because if the calculation is based on the square meter, the number of square meters is more than a few square meters, perhaps a few hundred more. A lot of money, and the processing of the wall, if you calculate the space to remove the windows and doors, you can save a lot of costs.
The owner, Li Xiaoli, lives on the second floor and does not have any outdoor work. However, on the quotation, Xiao Li saw about 1,800 yuan in high-altitude work. When asked about the worker, the other said: “The human body is out of reach. We call it a high-altitude operation fee, so the processing of high ceilings and wall tops requires the collection of high-altitude operations.†But in fact, Qin Ji’an, an expert of the Shaanxi Province’s indoor engineering quality supervision and inspection station, introduced bare, suspended, and ground three. The job above the meter can only be called high-altitude operations to collect the high-altitude operation fee. However, this situation for Xiao Li’s family is definitely not a high-altitude operation. Even the balcony of the ordinary owner’s home is paved with bricks, walls, etc. External wall operations do not belong to the construction of high altitudes, nor can they charge for overhead operations. Therefore, for the landlord, it is very necessary to carefully study every cost in the quotation. If you feel that you really do not know clearly, you must seek advice from a professional person to make sure that you spend money and be aware of consumption.
Body materials:FRPP,PPH
Seat material:FPM,EPDM,NBR
Lug connection: Flange ANSI CL150, JIS10K, DIN PN10
Design pressure:0.2~1.0Mpa (PN2~10 bar)